Evaluasi kinerja pemindahan overburden ditinjau dari produktivitas alat gali- muat dan alat angkut di front kerja 2 TB 2.2 Tempilang Kabupaten Bangka Barat mitra PT Timah (Persero) Tbk

Desi Fatimah, (NIM. 1031111014) (2016) Evaluasi kinerja pemindahan overburden ditinjau dari produktivitas alat gali- muat dan alat angkut di front kerja 2 TB 2.2 Tempilang Kabupaten Bangka Barat mitra PT Timah (Persero) Tbk. skripsi thesis, Universitas Bangka Belitung.

[thumbnail of COVER.pdf]
Preview
Text
COVER.pdf

Download (1MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (149kB) | Preview
[thumbnail of BAB II.pdf] Text
BAB II.pdf
Restricted to Registered users only

Download (2MB)
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (832kB)
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (394kB)
[thumbnail of BAB V.pdf]
Preview
Text
BAB V.pdf

Download (99kB) | Preview
[thumbnail of DAFTAR PUSTAKA.pdf]
Preview
Text
DAFTAR PUSTAKA.pdf

Download (230kB) | Preview

Abstract

TB 2.2 Tempilang is managed by partner of PT Timah (Persero) Tbk. Mining system that applied is a system of mechanical mine, where mining activities carried out by moving the overburden material prior to mine kaksa layer. The problem that occurs was the productivity of conveyance on the actual condition only 98.76% of target had been determined, which led to their failure in overburden removal volume amounted to 1.24%. Therefore, it was necessary to do an evaluation of the performance affecting factors of load haul equipment and conveyance in the field.
Evaluation was carried out by calculating the value of productivity, work efficiency and Match factor. The data required included cycles time data, effective working time, the amount of bucket loading, the type of overburden material and haul road geometry. Then the data was processed using the formula of mechanical soil removal and analyzed based on the literature related to the problem.
The factors causing productivity conveyance has not reached the target after the evaluation due to low efficiency of work, the least amount of bulk bucket loading, and the low value of match factors. The Alternatives can be done to improve the productivity of conveyance is to increase the effective work time, additional of bucket load haul equipments and additional of conveyances. Effective work time should be increased from 12.34 hours to 14.23 hours, so the work efficiency become 79.03% from 68.58% to the achievement of production is
113.80%. Bulk bucket should be added from 15 times to 20 times, so the productivity become 131.68 m3 / hour of 98.67 m3 / hour. Conveyance which is originally 2 units coupled into 3 units, resulting in a change of match factor equipment performance from 0.69 to 1.04 with the achievement of production is
141.14%.

Item Type: Thesis (skripsi)
Uncontrolled Keywords: productivity, work efficiency, match factor
Subjects: T Teknologi > TN Teknik Pertambangan. Metalurgi
Divisions: SKRIPSI > Fakultas Teknik > Teknik Pertambangan
Depositing User: Mr Arja Kusuma
Date Deposited: 26 Feb 2019 07:59
Last Modified: 26 Feb 2019 07:59
URI: https://repository.ubb.ac.id/id/eprint/2150

Actions (login required)

View Item View Item