Studi pengendalian banjir daerah aliran sungai Pedindang

Dina Wijayanti, (NIM. 1041211018) (2017) Studi pengendalian banjir daerah aliran sungai Pedindang. skripsi thesis, Universitas Bangka Belitung.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (739kB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (197kB) | Preview
[thumbnail of BAB II.pdf] Text
BAB II.pdf
Restricted to Registered users only

Download (887kB)
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (830kB)
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (834kB)
[thumbnail of BAB V.pdf]
Preview
Text
BAB V.pdf

Download (185kB) | Preview
[thumbnail of DAFTAR PUSTAKA.pdf]
Preview
Text
DAFTAR PUSTAKA.pdf

Download (263kB) | Preview

Abstract

The River Basin of Pedindang is a water stream that flows from the Mangkol hill where the left and right side of Pedindang river has been used for tin mining by the local residents. Mining waste is discharged into Pedindang river so that the river water becomes turbid and sedimentation occurs in the downstream area of fish market, which can cause flood especially in the rainy season caused by sedimentation of the tin mining. Not only that, the upstream of Pedindang river which is located in Mangkol hill has decreased the function of the catchment area because of many activities of deforestation which caused the rain water that are falling no longer percolated to the soil and becomes runoff water instead.This study aims to determine the ability of existing river capacity in accommodating flood discharge with river normalization, retention pond and land using modification as an effort to control the flood. Flow profile analysis was performed using the HEC-RAS version 4.1.0 program. In this study, flood control was planned using Q90th flood discharge. The selection of Q design is based on the highest rainfall that occurred before in Pedindang river of 183.90 mm which is equivalent to 90 times repeated year rainfall plan of 183.84 mm so that it got Q90th of 113.59 m3/sec. Normalization is done from the fish market kulong all the way through Pedindang village which is 3.8 km and can reduce the flooding up to 48.42%. The next effort is done by adding 50.6 Ha of retention pond and can reduce the flood by 31.98%. The next attempt to modify the land cover that generates flood discharge of Q90th by 78,67 m3/sec and can reduce the height of floods by 24,12%. After the combination of normalization handling retention ponds and land use controls, Pedindang river is able to accomodate flood discharge with 90 year repeated period and can reduce flooding by 92,31%

Item Type: Thesis (skripsi)
Uncontrolled Keywords: Flood, Normalization, Retention, Land Use, Hec-Ras 4.1
Subjects: T Teknologi > TA Teknik (Umum). Teknik Sipil (Umum)
T Teknologi > TD Teknologi Lingkungan. Teknik Sanitasi
Divisions: SKRIPSI > Fakultas Teknik > Teknik Sipil
Depositing User: Users 14 not found.
Date Deposited: 16 Nov 2018 07:45
Last Modified: 16 Nov 2018 07:45
URI: https://repository.ubb.ac.id/id/eprint/1631

Actions (login required)

View Item View Item